A team of painters is hired to paint the exterior of a museum. The total cost, C, in dollars, incurred by the museum for h hours of painting is given by the equation below. What is the best interpretation of 155 in the equation?C = 290 + 155hA. The total cost can be at most $155.B. It takes the team 155 hours to paint the exterior.C. Each additional hour of painting the exterior costs $155.D. $155 is the base cost regardless of how many hours it takes to paint the exterior.
Question
Answer:
Ceach additional hour would cost 155 and the 290 is the upfront cost
solved
general
11 months ago
4469