To help restore a beach sand is being added to the beach at a rate of s(t) = 65+24sin(.3t) tons per hour, where t is measured in hourse since 5:00a.m. how many tons of sand are added to the beach over the 3-hour period from 7:00a.m. to 10:00a.m.?
Question